Call NowText Us

Electrical Panel Upgrades in San Marcos CA

Old 100-amp panels and Federal Pacific breakers are documented fire hazards. Licensed 200-amp panel upgrades — permitted and inspected.

Have a Federal Pacific Stab-Lok panel?

They've been shown to fail to trip during overcurrent events. Replacement is the only safe fix.

Complete electrical panel replacement with a modern, properly-sized unit — typically upgrading from 100 to 200 amps so you can add solar, an EV charger, a heat pump, or an ADU without overloading your service.

Full permit with SDG&E coordination
200-amp service upgrade
Arc-fault and GFCI protection
Whole-home surge protection included
Clean, labeled panel directory
Federal Pacific & Zinsco replacement

Estimated Time

4-8 hours

Typical Investment

$2,500 - $4,500

Upgrade Your Panel Safely

Free panel inspection and quote from a licensed local electrician.